Hire World-Class, High Performing, Vetted Electrical Engineers.
Cut Labor Costs by 70%

We’ll Source, Hire and help Manage them
for you so you don’t have to.
Lifetime support, dedicated account manager
by your side, every step of the way!

 

Hire World-Class, High Performing, Vetted Electrical Engineers.
Cut Labor Costs by 70%

We’ll Source, Hire and help Manage them for you so you don’t have to.
Lifetime support, dedicated account manager by your side, every step of the way!

 

17 Years of
Virtual Staffing
Experience

Trusted by
3,368
SME’s

6,948
Virtual Staff
Hired

Hire World-Class, High Performing, Vetted Electrical Engineers.
Cut Labor Costs by 70%

We’ll Source, Hire and help Manage them for you so you don’t have to. Lifetime support, dedicated account manager by your side, every step of the way!


17 Years of
Virtual Staffing
Experience


Trusted by
3,368
SME’s


6,948
Virtual Staff
Hired

Top Talent. Lifetime Support Not Found Anywhere.

Hire Filipino Electrical Engineers

Businesses with electronic equipment and machinery need to make sure that it’s installed or maintained in good working condition. It’s not only for the regulatory bodies but also for public safety and continuous service for your customers.

For installation and maintenance, you need an electrical engineer for the job. Electrical engineers can design, install, build, and maintain the electrical equipment for your business.

It can include ventilation, broadcasting and communications systems, GPS, power generation, and many more.

Remote Staff has a roster of licensed Filipino electrical engineers that can assist your onsite team for online tasks.

 

Invalid phone number format.

Yes No

virtual assistant ratings
Our Clients love us.
Be the next success story!

Candidates:

8

Filter by Role:

*Booking interviews depend on candidates' availability and interest.

All-inclusive Rate: USD $12.97/hr

Gemmadel

Candidate ID: 590086


ADVANCED

    AutoCAD, Electrical system design, Microsoft Visio...

INTERMEDIATE

    Project Coordination, PlanSwift, Google Sheets, Quantity Surveying...
*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:
Full Time
Preferred Timezone:
Australian Western Standard Time Australian Central Standard Time Australian Eastern Standard Time New Zealand Daylight Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Full Time: $USD 12.97 per hour or $USD 2248.86 per month

Remote Staff Recruiter Comments

Gemmadel has over 9 years of specialized experience in electrical system drafting, design, and quantity surveying across diverse sectors, including residential, commercial, and industrial projects. She has consistently demonstrated technical expertise, particularly in electrical CAD design, quantity takeoffs, and project management. Her role as an Electrical System Drafter at Sourcefit emphasizes her capability in utilizing industry-standard tools like AutoCAD, Planswift, and specialized company software for precise project execution. She excels in producing detailed electrical plans and has worked with international teams, particularly in Australia and New Zealand.

  • Over 9 years of experience in electrical design and drafting, quantity surveying, and lighting solutions.
  • Worked for companies in the construction, electrical, and lighting industries in the Philippines, New Zealand, and Australia.
  • Proficient in AutoCAD, Dialux, Microsoft Visio, Clipsal Clipspec, and Exonet for electrical system design.
  • Experienced in conducting quantity takeoffs, project tendering, and producing comprehensive Bill of Materials.
  • Licensure: Registered Electrical Engineer in the Philippines.
  • She led the electrical takeoff and created tender documents that significantly improved project cost efficiency.
  • She played a pivotal role in designing complex residential and commercial lighting projects at Brightgreen Pty Ltd, using Dialux for high-quality renderings.
  • She engineered comprehensive electrical layouts for Worldwide Electrical Design, ensuring adherence to strict project deadlines.

Skills:

  • AutoCAD (9+ years), Dialux (6+ years), Microsoft Visio (3 years), and Planswift (2+ years).
  • Simpro, Exonet, Clipsal Clipspec, and Google Sheets for electrical plan execution, BOM creation, and reporting.
  • Advanced skills in electrical drafting and lighting design software. 

 

Specialist - The Predictive Index

Employment History

STAFF ENGINEER

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

July 2013 to May 2015 (22 Months)

Duties and Responsibilities:

• Spearheaded the creation of comprehensive 2D electrical design drawings, including One-line diagrams, Equipment layouts, Lighting plans, Power system updates, and system layouts for Fire alarm, Communication, Public address, CCTV, Emergency Notification, Security access, and Equipment earthing, alongside meticulous Load Schedule calculations.
• Conducted thorough verification of electrical materials, ensuring compliance with prevailing codes and standards, including Voltage drop and Short circuit analysis.
• Played a key role in on-site project inspections, diligently monitoring progress and ensuring the achievement of critical milestones.
• Contributed to the Testing & Commissioning of electrical equipment, ensuring operational excellence and strict adherence to project specification

DESIGNER 1

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

June 2015 to September 2016 (15 Months)

Duties and Responsibilities:

• Collaborated with EHT designers and performed calculations using EHT software (TraceCalcPro / Computrace), translating these calculations into design drawings using AutoCAD or SmartSketch (S3D Application).
• Prepared schedules, estimates, and other project-related deliverables to ensure smooth workflow and project timelines.
• Worked closely with other disciplines to manage project interfaces and ensure cohesive design integration.
• Applied project code standards consistently to design drawings, ensuring compliance with industry regulations and specifications.

CAD ENGINEER

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

October 2016 to May 2018 (19 Months)

Duties and Responsibilities:

•    Spearheaded CAD engineering projects, expertly crafting designs for both residential and commercial structures.
•    Engineered comprehensive layouts for electrical power, fire alarm, and data systems, ensuring optimal functionality.
•    Developed precise schematic diagrams aligned with project layouts, consistently meeting strict delivery deadlines.

LIGHTING DESIGNER

Industry:

Construction / Building / Engineering

Employment Period:

January 2019 to December 2021 (35 Months)

Duties and Responsibilities:

•    Expertise in residential and commercial lighting design tailored for Australian clientele.  
•     Proficient in CAD drafting with AutoCAD for precise and detailed lighting plans.
•    Advanced skills in Dialux for high-quality lighting renderings and simulations.
•    Competent in editing photometric files to ensure accurate lighting specifications.
•    Adept at conducting quantity takeoffs of light fittings for project requirements.
•    Capable of generating comprehensive Bills of Materials (BOM) and quotes for lighting design projects.
•    Proficient in extracting quantities from plans and proposing alternative lighting solutions for competitive bids.

QUANTITY SURVEYOR

Industry:

Electrical & Electronics

Employment Period:

December 2021 to September 2022 (9 Months)

Duties and Responsibilities:

• Expertly performed electrical takeoff and plan markup for tender documents using Planswift software.
• Developed comprehensive Bill of Material and Labor using Google Sheets to enhance project efficiency.
• Skilled in generating accurate quotes and processing purchase orders through the Simpro system.
• Proficient in CAD drafting of intricate electrical systems, including lighting, power, and data communications, using AutoCAD.
• Compiled critical KPI project reports and conducted thorough cost comparison analyses to support informed financial decision-making.

ELECTRICAL SYSTEM DRAFTER

Industry:

Call Center / IT-Enabled Services / BPO

Employment Period:

September 2022 to January 1970 (632 Months)

Duties and Responsibilities:

•    Expertly generated accurate quotes utilizing Exonet, the company's specialized software.
•    Skillfully created detailed markup plans with Microsoft Visio and Clipsal Clipspec, adhering to company standards.
•    Conducted thorough final reviews and updates of electrical system plans to incorporate any received variations.
•    Maintained effective communication with building companies to gather essential process information.

Education History

Field of Study:

Engineering (Aviation/Aeronautics/Astronautics)

Major:

BACHELOR OF SCIENCE IN ELECTRICAL ENGINEERING

Graduation Date:

October 1, 2012

Located In:

Philippines

License and Certification: :

Registered since 2013


Skills

ADVANCED ★★★

    AutoCADElectrical system designMicrosoft Visio

INTERMEDIATE ★★

    Project CoordinationPlanSwiftGoogle SheetsQuantity Surveying

Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Private Room
  • Speed Test Result: https://www.speedtest.net/result/16856949074
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: HP (AMD Ryzen 5 4600H with Radeon Graphics)
  • Processor: AMD Ryzen 5 4600H with Radeon Graphics
  • Operating System: Windows 11

All-inclusive Rate: USD $9.90/hr

Jay

Candidate ID: 562178


ADVANCED

    Data Entry, Administrative Skills, Electrical system design, Project Documentation...

INTERMEDIATE

    Virtual Assistant Skills, Communication Skills, Organizational Skills...
*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:
Part Time
Preferred Timezone:
Australian Eastern Standard Time New Zealand Daylight Time Australian Western Standard Time Australian Central Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 9.90 per hour or $USD 857.81 per month

Remote Staff Recruiter Comments

  • Jay worked for at least 4 years and has a degree in Electrical Engineering. He has been a registered licensed Electrical Engineer since 2019.
  • As a project manager in his previous company, he supervised project activities ensuring compliance with plans and specifications.
  • Designed electrical single-line diagrams, panel schedules, and connection diagrams for solar electric systems using CAD.
  • He is well experienced in collaborating with different teams such as sales, project management, and installation teams to meet clients' needs and internal deadlines.
  • He is familiar with Australian and New Zealand standards.
  • He is familiar with primary and secondary electrical engineering design. He does not have a practical working experience with SCADA but he understands and can adapt what is needed of him for this system.
  • He is familiar with Programmable Logic Controllers
  • He is well exposed with these tools:
  • Google Workspace: Gmail, Calendar, Drive, Docs, Sheets, Slides, Sites, Meet, Chat
  • Microsoft 365: Teams, Word, Excel, PowerPoint, Outlook, OneNote, OneDrive
  • ClickUp
  • Notion
  • Communication Tools
  • Zoom
  • Slack
  • Discord
  • Skype
  • WhatsApp
  • Salesforce.com
  • Technical Tools and Software
  • AutoCAD
  • ETAP
  • Multisim
  • AuroraSolar
  • Arduino IDE
  • He is available to work as soon as possible.
  • Predictive Index Behavioral Profile- Guardian
https://www.predictiveindex.com/reference-profile/guardian/ 



Strongest Behaviors
Driven to protect the company against risk by thoroughly leveraging their background and strictly following “the book.”
Cautious; follows a well-established and proven plan to avoid making mistakes. Does the background research necessary to have proof to support decisions before action is taken.
Detail-oriented and accommodating; most comfortable working as part of a well-defined team for which they produce high-quality output and decisions.
Behavioral Summary 
A very conscientious and disciplined person; particularly careful, thorough, and accurate in their work. This individual is exacting and strives to produce results that precisely meet the established goals. Works best where there are clear standards, expectations, reporting relationships and measurements for the work. Marijoy will depend upon professional training, their own experience, or management leadership, to provide those standards and the structure needed for their work.

Employment History

Project Design Engineer

Industry:

Construction / Building / Engineering

Employment Period:

April 2022 to May 2024 (25 Months)

Duties and Responsibilities:

  • Designed electrical single-line diagrams, panel schedules, and connection diagrams for solar electric systems using computer-aided design (CAD), achieving a productivity score of nearly 110%.
  • Ensured that electrical designs complied with all relevant codes and standards.
  • Collaborated effectively with sales, project management, and installation teams to meet clients' needs and internal deadlines.
  • Conducted comprehensive reviews of solar PV system designs prior to submission to ensure accuracy, completeness, and compliance with project requirements, codes, and standards.

Electrical Project Engineer

Industry:

Construction / Building / Engineering

Employment Period:

October 2019 to March 2022 (28 Months)

Duties and Responsibilities:

  • Supervised project activities in compliance with plans and specifications, leading to an increase of nearly $200,000 in project revenue.
  • Created Gantt charts to visualize project timelines and utilized S-curves to track project progress, comparing planned versus actual performance.
  • Collaborated with other engineering disciplines, such as mechanical and civil engineering, to integrate electrical systems with overall project requirements.
  • Conducted quality assurance checks and verification tests on electrical systems and components to ensure performance, reliability, and safety.

Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Electrical Engineering

Graduation Date:

June 11, 2019

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

    Data Entry, Administrative Skills, Electrical system design, Project Documentation,

INTERMEDIATE ★★

    Virtual Assistant SkillsCommunication SkillsOrganizational Skills

Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Private Room
  • Speed Test Result: https://www.speedtest.net/result/16309274130
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: Dell (Intel(R) Core(TM) i7-8550U CPU @ 1.80GHz 1.99 GHz)
  • Processor: Intel(R) Core(TM) i7-8550U CPU @ 1.80GHz 1.99 GHz
  • Operating System: Windows 11

All-inclusive Rate: USD $19.13/hr

Adelino

Candidate ID: 502650


ADVANCED

    Electrical system design, MicroStation SE, AutoCAD, Microsoft Office...

INTERMEDIATE

    Primavera, MicroStation...
*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:
Part Time Full Time
Preferred Timezone:
Australian Eastern Standard Time New Zealand Daylight Time UK London
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 19.13 per hour or $USD 1657.67 per month

Full Time: $USD 19.13 per hour or $USD 3315.34 per month

Remote Staff Recruiter Comments

Lino is a graduate of Electrical Engineering. He is a licensed Electrical Engineer and Master Electrician. He was an 8th placer when the Board Examination result for Electrical Engineering was released and got an 89% rating. He is currently taking up a Master's Degree in Electrical engineering and will be able to finish it by early next year.  He has more than 25 years of solid experience and has been working in the Construction and Oil & Gas companies. Most of his experiences are working abroad where he got to work closely with US, Australian, German, Saudi Arabian, Libyan, and UK clients. He got back to the Philippines last year and has been a freelancer since then. In his years of experience, he is already proficient in handling the following tasks:
  • Creating a power distribution system design
  • Electrical load analysis
  • Analyzing system studies (load flow analysis, short circuit analysis, motor starting analysis, and  
  • ground grid design analysis)
  • Preparing various Technical Specifications and Datasheets for Switchgears, Motor 
  • Control Center, Panelboards, UPS, Transformer, Motor & Generator
  • Developing single-line and schematic diagrams
  • Preparing layout for power cable, containment routing, equipment layout, interconnection diagram, hazardous area classification, grounding, and lightning
  • Managing electrical engineers and designers
He also has a background in Estimation where he prepared cost estimates, material requisition, technical bid evaluation, etc. 
He uses the following tools:
  • AutoCAD (15 years)
  • MicroStation (2 years)
  • Microsoft Office Suite (Word, Excel, and Powerpoint)
  • ETAP (Electrical Transient and Analysis Program)
  • Dialux
  • Ecodial
  • Amtech
He is available to start immediately and is amenable to working a dayshift schedule for any part-time role.

Predictive Index Behavioral Profile-Controller

Strongest Behaviors
  • Detail-oriented and thorough; works to ensure things don’t fall through the cracks, and follows up to ensure they’re done properly and on time.
  • Operationally, as opposed to socially, focused. Thinks, in specific terms, about what needs to be done and how to do it accurately and flawlessly; follows, in a literal way, that execution plan.
  • Cautious; follows a well-established and proven plan to avoid making mistakes. Does the background research necessary to have proof to support decisions before action is taken.
Behavioral Summary

Lino is a self-disciplined, conscientious person who will develop a high degree of expertise and skill in a specialized job. Has the drive to get things done right and in accordance with established standards of accuracy and quality.

A conservative and analytical person who respects traditional organizational values. Reserved, serious, and thoughtful about everything to be done, is a no-nonsense worker who worries about getting things exactly right. Never superficial, will make sure that he knows what he's talking about before speaking. Needs a lot of certainty and structure in his work so that it meets very high, specific quality standards.

Understanding the technical aspects of own work well, is capable of exercising ingenuity in problem-solving within the limits of specialized expertise and training. Conservative and eager to avoid risk, is cautious and skeptical about new ideas. Will be comfortable with established, approved systems, technology, organizational relationships, and people.


Employment History

Lead Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

February 2020 to October 2022 (32 Months)

Duties and Responsibilities:

  • Reviewed all electrical submittals, providing detailed comments and guidance to ensure the successful execution of detailed engineering. Evaluations were conducted in strict accordance with local regulations, standards, and applicable international standards.

  • Attended weekly coordination meetings with the EPC contractor and equipment vendors, ensuring alignment on project goals and addressing any emerging issues.

  • Conducted site surveys at oil fields to gather critical information necessary for the accurate planning and execution of electrical projects.

  • Actively participated in internal and external project meetings, including reviews of 3D drawings and HAZOP assessments, contributing to the overall safety and effectiveness of the projects.

  • Contributed to the documentation and application of lessons learned from previous projects to improve future project execution.

Projects Handled/Involved:

  • Upgrade of Electrical Substations in Beda Oil Field in Benghazi, Libya (Client: AGOCO - Arabian Gulf Oil Co. Libya).
  • Detailed Engineering Phase for New Fiscal Metering System at Amal Field in Amal Oil Field, Libya (Client: Harouge Oil Operations).

Lead Electrical Engineer

Industry:

Oil / Gas / Petroleum

Employment Period:

February 2016 to September 2018 (31 Months)

Duties and Responsibilities:

  • Managed a team of Electrical Engineers and Designers, ensuring effective collaboration and timely delivery of project milestones.

  • Ensured that all design drawings produced by the team were fully compliant with client specifications, local authority requirements, industry codes, and standards before submission for client review and approval.

  • Conducted site surveys and provided comprehensive reports to support accurate and efficient project execution.

  • Performed system studies, including Short Circuit, Load Flow, Motor Starting Analysis, Arc Flash, and Protection Coordination using ETAP software to ensure the reliability and safety of electrical systems.

  • Prepared illumination calculations using COOPER lighting software, ensuring proper lighting design that meets project requirements.

  • Actively participated in both internal and external project coordination meetings, ensuring alignment across all stakeholders.

  • Assisted the project team during the proposal stage by providing material take-offs (MTO), bills of quantities (BOQ), work volume assessments, engineering deliverables, man-hour estimates, and defining the electrical scope of work and demarcation. Participated in internal and external project Kick-Off meetings.

  • Prepared material requisitions for long-lead electrical items and bulk materials, ensuring timely procurement to meet project deadlines.

  • Developed individual design plans, material requisitions, and technical bid evaluations (TBE), and contributed to the Design Basis Memorandum.

  • Coordinated with other disciplines, including Piping, Instrumentation, Civil, and Mechanical, to resolve technical issues related to P&ID, control philosophy, foundation details, and rotating equipment.

  • Reviewed and evaluated electrical Vendor Print (VP) documents to ensure they met project specifications.

  • Provided technical assistance to QA/QC teams by reviewing Inspection Test Plans (ITP) and method statements, ensuring adherence to quality standards.

  • Demonstrated a strong commitment to health, safety, and environmental responsibility throughout all project phases.

  • Participated in HAZOP meetings when required, contributing to safety and risk management processes.

  • Participated in internal QA audits to ensure compliance with quality management systems.

  • Participated in Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) to verify full compliance with contract requirements and ensure system readiness for operation and on-time project delivery.

  • Provided technical support to the construction team by responding to technical queries and clarifications, facilitating smooth project execution.

Projects Handled/Involved:

  • Engineering, Procurement, Construction, and Management (EPCM) for Sebarok Offshore Expansion Project in Sebarok Offshore (Client: VOPAK).
  • EPCM for Bulk Storage Tanks in Pengarang, Malaysia (Client: RAPID).
  • Design and Construction of a 3.6 Megawatt Off-Grid Solar Photovoltaic System for SATS Airfreight Terminals 5 and 6, Changi Airport, Singapore (Client: Sembcorp Industries).

Senior Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

July 2012 to July 2013 (12 Months)

Duties and Responsibilities:

  • Assisted the Lead Engineer in managing the electrical team, ensuring effective collaboration and task completion.

  • Studied client documents, including project proposals and specifications, and raised necessary clarifications to ensure a thorough understanding of project requirements.

  • Took responsibility for all electrical scope requirements related to various mechanical packages, ensuring alignment with project objectives.

  • Ensured that all design drawings produced by the team were in compliance with client specifications, local authority standards, and industry codes before submission for client review and approval.

  • Attended internal and external project coordination meetings with Mechanical Package Equipment Vendors and Client Representatives to facilitate smooth communication and address any project-related issues.

  • Acted as the company’s focal point for electrical engineering matters, liaising with engineering services sub-contractors and vendors to ensure alignment with project goals.

  • Prepared detailed Electrical Package Equipment Specifications and Datasheets for Gas Turbines, Diesel and Black Start Generators, MV Motors, VSDS, Switchgears, UPS, and other critical components.

  • Prepared material requisitions for long-lead electrical items and bulk materials, ensuring timely procurement to meet project timelines.

  • Prepared individual design plans, material requisitions, and technical bid tabulations (TBT), and contributed to the Design Basis Memorandum.

  • Developed the Power Distribution System philosophy to guide the design and implementation of electrical systems.

  • Provided technical clarifications for electrical components of various mechanical package equipment, ensuring accurate and efficient communication with all stakeholders.

  • Attended Bid Clarification Meetings with bidders, clients, and other disciplines to resolve any uncertainties and ensure a clear understanding of project requirements.

  • Coordinated with other disciplines, including Piping, Instrumentation, Civil, and Mechanical, to resolve technical issues related to P&ID, control philosophy, foundation details, and rotating equipment.

  • Reviewed and evaluated electrical Vendor Print (VP) documents to ensure compliance with project specifications.

  • Responded to client comments on submitted engineering deliverables, incorporating feedback to meet client expectations.

  • Participated in HAZOP coordination meetings and internal QA audits to ensure safety and quality compliance.

  • Conducted system studies, including Short Circuit, Load Flow, Motor Starting Analysis, Arc Flash, and Protection Coordination, using ETAP software.

  • Performed illumination calculations using DIALUX software to ensure proper lighting design.

Projects Handled/Involved:

  • Conceptual & FEED for North Malay Basin Offshore Platform – Greenfield Project in Malaysia (Client: HESS Exploration).
  • EPCM for Malikai TLP (Tension Leg Platform) Project – HULL and Topsides, Greenfield Project in Sabah, Malaysia (Client: Sabah Shell Exploration and Production).

Electrical Design Engineer

Industry:

Electrical & Electronics

Employment Period:

May 1997 to June 2000 (37 Months)

Duties and Responsibilities:

  • Reported directly to the Senior Electrical Design Engineer, ensuring alignment with project goals and technical requirements.

  • Clearly defined the technical scope of each project by making customer requirements and specifications explicit, ensuring precise execution.

  • Prepared and managed detailed engineering and design schedules for assigned work, maintaining project timelines and milestones.

  • Executed basic electrical engineering tasks in strict accordance with client requirements, ensuring high-quality deliverables.

  • Provided early assessments of the company’s technical capabilities relative to customer expectations. Developed tailored solutions that closely matched client needs while optimizing the company’s existing standard offerings.

  • Addressed technical inquiries from customers, Project Office Managers (POM), production teams, and draftsmen by delivering well-reasoned and expert advice.

  • Formalized technical data for each job using Computer-Aided Design and Drafting (AutoCAD) software, ensuring accurate and precise designs.

  • Reviewed and assessed suppliers’ abilities to comply with project specifications, coordinating closely with the materials section. Ensured thorough compliance by verifying supplier acknowledgments of EPS orders and actively participating in necessary meetings, including those with customers when the Senior Electrical Engineer was unavailable.

  • Worked in close collaboration with the mechanical section to ensure cohesive project execution.

  • Effectively utilized new tools such as ELECDES, AutoCAD 2000, MM3000 system, ELONET, and ECODIAL design software to enhance design accuracy and efficiency.

  • Ensured all electrical design drawings adhered to project specifications, relevant codes, and industry standards.

Projects Handled/Involved:

  • Design and Supply of 33kV & 13.8kV MC Set Switchgears for six different SEC-CRB Substations in Riyadh (S/S # 7115, 7113, 7782, 8077, 7845 & 7089) as per SEC-CRB Specifications. (Client: HADANIA CORPORATION / Saudi Electricity Company)

  • Design and Supervision of 2000KVA Package Substation (Outdoor Kiosk), 33KV/380VAC, 3Ph., 4W, 60Hz, IEC Standard in Tabuk Garden Village-2B, Phase 1, Tabuk, KSA. (Client: Saudi Electricity Company)

  • Construction and Monitoring of Two 132KV Substations (S/S No. 8055 & 8056), and Extension of Substation 8020; Design and Monitoring of AC Distribution Board 220/127VAC, 1000A, 3Ph., 4W, 60Hz, 25KA/1sec., IEC Standard. (Client: Daewoo Arabia Limited / Central Region Branch, KSA)

  • Design and Monitoring of ATS (Automatic Transfer Switch), 220VAC, 1200A, 25KA/1sec., 60Hz, NEMA Standard for King Fahad International Airport, Riyadh, Saudi Arabia. (Client: Saudi Aramco)

Part-time Faculty Member

Industry:

Education

Employment Period:

April 1994 to March 1997 (35 Months)

Duties and Responsibilities:

  • Taught core engineering subjects such as:
    • Electrical and electronic circuits
    • Energy conversion
    • Engineering materials
    • Mathematics
    • Physics
  • Instructed on professional engineering topics, including electrical system design for buildings.

Electrical Engineer

Industry:

Oil / Gas / Petroleum

Employment Period:

April 1994 to March 1997 (35 Months)

Duties and Responsibilities:

  • Prepared comprehensive electrical design packages, including scope of work, electrical specifications, material take-offs, design calculations, construction drawings, material requisitions, and other necessary deliverables.

  • Provided clear instructions to electrical designers and CAD operators, overseeing all related engineering design activities to ensure accuracy and efficiency.

  • Prepared detailed material take-off (MTO) lists using Excel, ensuring accurate documentation of materials required for projects.

  • Assisted senior engineers in evaluating technical bid documents, contributing to informed decision-making during the procurement process.

  • Conducted regular site visits to monitor work progress, ensuring that it aligns with applicable codes, standards, specifications, and the overall design intent of the project.

  • Interpreted and reviewed vendor drawings to ensure they meet project requirements and specifications.

  • Enhanced expertise by studying industry practices and accumulating knowledge from more experienced colleagues.

  • Applied Shell DEP standards and other international standards to all projects, ensuring consistency and compliance.

  • Maintained positive relationships with consultants, vendors, and contractors, fostering collaboration and smooth project execution.

  • Prepared power distribution system design calculations using Excel, ensuring precise and reliable designs.

  • Utilized Philips lighting software to perform accurate lighting design calculations for various projects.

Projects Handled/Involved:

  • EPC for Caustic Injection Pump (100HP, 480VAC, 3Ph, 60Hz) at Pandacan Oil Depot, Metro Manila, Philippines. (Client: Pilipinas Shell Petroleum Corporation)

  • EPC for Retail Stations Upgrade at various retail stations in the National Capital Region, Philippines. (Client: Pilipinas Shell Petroleum Corporation)

  • EPC for Substation No. 21A Upgrade (13.8kV, 4000A, 3Ph, 50kA, 60Hz) at Pandacan Oil Depot, Metro Manila, Philippines. (Client: Pilipinas Shell Petroleum Corporation)

Lead Electrical Engineer

Industry:

Electrical & Electronics

Employment Period:

August 2000 to May 2005 (57 Months)

Duties and Responsibilities:

  • Collaborated with various disciplines including projects, procurement, main contractors, vendors, and other involved groups to ensure seamless project execution.

  • Participated in the review of all electrical engineering deliverables submitted by contractors and consultants, ensuring compliance with project specifications and standards.

  • Engaged in weekly coordination meetings with contractors, vendors, and third parties to discuss and clarify interfaces, requests, decisions, approvals, project status, and responses.

  •  Provided contractors with essential conceptual documents, including specifications, datasheets, and single-line diagrams during the tender stage.

  • Responded to contractors' technical queries, ensuring clear and accurate communication of project requirements.

  • Conducted regular site visits to assess work progress, providing comments and oversight to ensure compliance with applicable codes, standards, specifications, and the project’s design intent.

  •  Offered electrical support to construction contractors by clarifying technical issues during the construction phase.

  • Participated in FAT and SAT to verify full compliance with contract requirements, ensuring system availability to support operations and on-time project delivery.

Projects Handled/Involved:

  • Design and Construction of GIS 110 kV Substation for Madina Industrial City, Kingdom of Saudi Arabia (Client: SCECO).
  • Design and Construction of GIS 132 kV Substation from Riyadh to Qaseem, Kingdom of Saudi Arabia (Client: SCECO).
  • Design and Construction of 15MW Wind Power Plant in Taif, Western Province, Kingdom of Saudi Arabia (Client: SCECO).

Electrical Design Engineer

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

June 2006 to January 2009 (31 Months)

Duties and Responsibilities:

  • Performed engineering duties with a primary focus on power distribution design, including the preparation of essential electrical deliverables such as calculations and drawings.

  • Participated in meetings with the Lead Engineer, clients, and third parties to discuss and clarify project interfaces, requests, decisions, approvals, status updates, and responses.

  • Regularly reviewed the scope of work to identify any variations, whether initiated by the client or internally within the team. Secured approval from the Lead or Senior Engineer for any changes affecting the project budget or milestones before implementation.

  •  Reviewed technical bid submissions for electrical equipment provided by qualified vendors, ensuring compliance with project requirements.

  • Incorporated client-approved resolutions of all comments into the drawings and documents produced, under the guidance of the Senior Electrical Engineer or Lead Engineer.

  • Applied the latest international and national standards, codes of practice, and good engineering practices to all work performed, ensuring high-quality and compliant outcomes.

  • Conducted regular site visits to monitor work progress, providing feedback to ensure adherence to applicable codes, standards, specifications, and the project’s design intent.

  • Conducted system studies, including Short Circuit, Load Flow, Motor Starting Analysis, Arc Flash, and Protection Coordination, using ETAP software to ensure safe and efficient electrical system design.

  • Prepared power distribution system design calculations using SIMARIS (Siemens software) and lighting calculations using DIALUX software, ensuring accurate and reliable designs.

Projects Handled/Involved:

  • Formula-1 Racetrack Project: EPC of Electrical Substations and External Lighting on Yas Island, Abu Dhabi, UAE (Client: Aldar Real Estate Properties).

  • EPC of Power Supply Skid for Artificial Lift Well Project: Managed the power supply for five artificial lift wells in Asab and Shah, Abu Dhabi, UAE (Client: Abu Dhabi Company for Onshore Oil Operations - ADCO).

  • Lighting and Power Supply Distribution System Design: Designed the lighting and power distribution system for the Baggage Handling System at Dubai International Airport Terminal 3, Dubai, UAE (Client: Dubai Municipality).

Lead Electrical Engineer

Industry:

Oil / Gas / Petroleum

Employment Period:

December 2022 to July 2024 (19 Months)

Duties and Responsibilities:

  • Lead and manage a team of Electrical Engineers, Electrical Design Engineers, and Electrical Designers to ensure timely and efficient project delivery.
  • Facilitate effective communication and collaboration within the team and with other engineering disciplines.Provide technical guidance and mentorship to junior engineers and designers, fostering a culture of continuous improvement.
  • Oversee the electrical engineering aspects of multiple projects, ensuring compliance with project specifications, industry standards, and client requirements.
  • Develop and manage project schedules, ensuring that all deliverables are completed on time and within budget
  • Coordinate with project managers and other discipline leads to align project goals and resources.
  • Review and approve electrical design documentation, including single-line diagrams, schematics, and layout drawings.
  • Ensure all designs meet safety, reliability, and sustainability standards while optimizing cost and performance.
  • Perform technical assessments and provide solutions to complex engineering challenges.
  • Implement and enforce quality control procedures for all electrical engineering deliverables.
  • Ensure adherence to relevant codes, standards, and regulations (e.g., IEC, NEC).
  • Conduct design reviews and audits to ensure the integrity and accuracy of all engineering outputs.
  • Interface with clients and stakeholders to understand project requirements and address concerns or changes in scope.
  • Prepare and deliver technical presentations and reports to clients, providing clear and concise updates on project status and challenges.
  • Allocate resources effectively within the team to meet project demands and optimize productivity.
  • Monitor project budgets related to electrical engineering tasks and implement cost-saving strategies where applicable.
  • Promote the adoption of new technologies and methodologies in electrical engineering design and execution.
  • Lead initiatives to improve the efficiency, quality, and sustainability of electrical engineering practices within the team.
  • Ensure that all electrical engineering activities comply with HSE policies and procedures.
  • Identify and mitigate potential HSE risks in electrical designs and installatio

Senior Electrical and Power Engineer

Industry:

Construction / Building / Engineering

Employment Period:

June 2009 to June 2012 (36 Months)

Duties and Responsibilities:

  • Led the electrical engineering efforts for RFS-080 & RFS-084 projects for the RASGAS client, ensuring successful project execution and delivery.

  • Assisted the team leader in managing the daily activities of the electrical engineering group, providing regular progress reports on deliverables, and overseeing a team of Electrical Engineers and Designers.

  •  Reviewed client documents, including project proposals and specifications, and raised necessary clarifications to ensure alignment with project requirements.

  • Ensured that all design drawings produced by the team were in compliance with client specifications, local authority standards, and industry codes before submission for client review and approval.

  • Conducted site surveys and prepared detailed site survey reports to support project planning and execution.

  • Performed system studies such as Short Circuit, Load Flow, Motor Starting Analysis, Arc Flash, and Protection Coordination using ETAP software. Prepared illumination calculations using COOPER lighting software.

  • Actively participated in both internal and external project coordination meetings, including project Kick-Off meetings, to ensure clear communication and alignment across all stakeholders.

  • Assisted the project team during the proposal stage by providing material take-offs (MTO), bills of quantities (BOQ), engineering deliverables, man-hour estimates, electrical scope of work, and demarcation.

  • Prepared material requisitions for long-lead electrical items and bulk materials, ensuring timely procurement to meet project schedules.

  • Prepared individual design plans, material requisitions, technical bid evaluations (TBE), and contributed to the Design Basis Memorandum. Reviewed and evaluated electrical Vendor Print (VP) documents.

  • Coordinated with other disciplines, including Piping, Instrumentation, Civil, and Mechanical, to resolve technical issues related to P&ID, control philosophy, foundation details, and rotating equipment.

  • Responded to client comments on submitted engineering deliverables and provided technical assistance to QA/QC by reviewing Inspection Test Plans (ITP) and method statements.

  • Demonstrated a strong commitment to health, safety, and environmental responsibility throughout all project phases.

  • Participated in HAZOP coordination meetings and internal QA audits to ensure compliance with safety and quality standards.

  • Participated in FAT (Factory Acceptance Test) and SAT (Site Acceptance Test) to verify full compliance with contract requirements and ensure system readiness for operation and timely project delivery.

  • Provided technical support to the construction team by addressing related queries and clarifications.

  • Implemented, monitored, and controlled ISMS (Information Security Management System) as per KENTZ Information Security Manual, reporting any violations to the electrical Group Leader.

Projects Handled/Involved:

  • RFS-080: FEED and Detail Engineering for AKG-454, Additional Feeder to DP-LCS058 Gas Metering Facilities, LNG Train 2, Ras Laffan (Client: RASGAS).
  • RFS-084: Continuous Enhancement Monitoring System for various stacks located in Train-1, 2, 3, 4, 5, 6, AKG-1 & Utilities, RASGAS Refinery (Client: RASGAS).
  • Sidra Medical and Research Center Project: Doha, Qatar (Client: Qatar Petroleum).

Senior Electrical Engineer

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

August 2013 to December 2015 (28 Months)

Duties and Responsibilities:

  • Oversaw, monitored, and reviewed contractor transmittals related to the electrical engineering discipline, including electrical layouts, single-line diagrams, load schedules, system studies, specifications, material requisitions, electrical calculations, and other relevant deliverables. Ensured that all systems were safe to operate, maintainable, and compliant with international codes, standards, and project specifications.

  • Assisted contractors in resolving technical issues and problems, providing guidance and expertise to ensure successful project outcomes.

  • Evaluated, managed, and reported on electrical issues, including design reviews, risk assessments, and coordination with other departments to address and close out any concerns.

  • Coordinated, monitored, and reviewed Technical Bid Evaluations for electrical equipment, ensuring that all proposals met the required codes, standards, and project specifications.

  • Acted as an interface between the company’s project team and the Lead Contractor, ensuring effective communication and coordination on detailed engineering design matters.

  • Actively participated in internal and external project meetings, including reviews of 3D drawings and HAZOP assessments, contributing expertise to ensure project success.

  • Served as the company’s primary point of contact for electrical engineering issues, liaising with the Lead Contractor to address any concerns or challenges.

  • Contributed to the documentation of lessons learned and applied relevant insights from previous Aramco projects to improve current and future project outcomes.

Projects Handled/Involved:

  • Detailed Engineering of New Jazan Refinery in Jizan Province, Saudi Arabia (Client: Saudi Aramco).

Senior Electrical Engineer

Industry:

Oil / Gas / Petroleum

Employment Period:

October 2018 to November 2019 (13 Months)

Duties and Responsibilities:

  • Lead the design of electrical systems for various projects, ensuring they meet all required standards.
  • Create and review electrical diagrams and drawings.
  • Choose the right electrical components for projects.
  • Oversee the electrical engineering part of multiple projects, ensuring they stay on schedule and within budget.
  • Work closely with other engineering teams to ensure smooth integration of electrical systems.
  • Communicate with clients, contractors, and suppliers to keep projects on track.
  • Guide and support junior engineers and designers.
  • Review and ensure the quality of electrical designs.
  • Solve technical issues that come up during projects.
  • Understand client needs and offer technical solutions.
  • Prepare and present reports and project updates to clients.
  • Make design adjustments based on client feedback.
  • Make sure all designs follow local and international standards.
  • Keep up-to-date with changes in industry regulations.
  • Assess and manage risks related to electrical safety.
  • Introduce new technologies and methods to improve efficiency.
  • Stay informed about industry trends and recommend useful new practices.
  • Encourage continuous learning and improvement within the team.
  • Effectively allocate team resources to maximize productivity.
  • Monitor budgets and find ways to save costs without sacrificing quality.
  • Ensure all work follows health, safety, and environmental guidelines.
  • Identify and address potential safety risks in electrical systems.
  • Promote a safety-focused culture in the team.

PMC Senior Electrical Engineer

Industry:

Oil / Gas / Petroleum

Employment Period:

August 2005 to May 2006 (9 Months)

Duties and Responsibilities:

Oversee electrical work for refinery and petrochemical projects, keeping them on schedule and within goals.
Coordinate with other engineering teams to ensure smooth integration of electrical systems.
Communicate with contractors and vendors to meet project needs.
Review and approve electrical designs, ensuring they meet standards and regulations.
Provide technical guidance to ensure safe and accurate design and installation.
Conduct audits and inspections to maintain safety and quality.
Act as the main contact for electrical engineering issues, updating clients and stakeholders regularly.
Prepare and present reports and technical documents to management and partners.
Resolve any electrical issues raised by stakeholders.
Ensure all electrical work follows local regulations, international standards, and safety protocols.
Conduct risk assessments and implement safety measures to prevent electrical hazards.
Promote safety through regular briefings and training sessions.
Allocate resources effectively to ensure efficient use of manpower and materials.
Monitor budgets and find ways to save costs in electrical tasks.
Implement quality control procedures to ensure high standards in all electrical work.
Visit sites to check that installations match approved designs.
Address any defects or non-conformities in electrical systems.
Promote the use of new technologies and practices to improve project efficiency.
Lead efforts to improve the reliability and performance of electrical systems.
Provide leadership and mentorship to junior engineers and support staff.
Encourage collaboration and continuous improvement within the team.


Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Electrical Engineering

Graduation Date:

March 1, 1994

Located In:

Philippines

License and Certification: :

Registered Electrical Engineer
Registered Master Electrician
Professional Eligibility Civil Service
Lifetime member of Integrated Electrical Engineers

Field of Study:

Engineering (Electrical/Electronic)

Major:

Graduation Date:

May 1, 2023

Located In:

Philippines

License and Certification: :

N/A

Field of Study:

Engineering (Electrical/Electronic)

Major:

Graduation Date:

March 1, 1998

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

    Electrical system design, MicroStation SE, AutoCAD, Microsoft Office,

INTERMEDIATE ★★

    PrimaveraMicroStation

Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Private Room
  • Speed Test Result: 132.38 (download), 81.99 (upload)
  • Internet Type: DSL
  • Hardware Type: Laptop
  • Brand Name: HP Laptop (Intel(R) Core(TM) i7-10750H CPU @ 2.60GHz 2.59GHz)
  • Processor: Intel(R) Core(TM) i7-10750H CPU @ 2.60GHz 2.59GHz
  • Operating System: Windows 11

All-inclusive Rate: USD $8.87/hr

Luisito

Candidate ID: 429035


ADVANCED

    AutoCAD, Design Development, Electrical system design, Electronics...

INTERMEDIATE

    Management...
*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:
Full Time Part Time
Preferred Timezone:
Australian Western Standard Time Australian Central Standard Time Australian Eastern Standard Time New Zealand Daylight Time US Pacific Standard Time UK London
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 9.90 per hour or $USD 857.81 per month

Full Time: $USD 8.87 per hour or $USD 1537.88 per month

Remote Staff Recruiter Comments

Lui is a licensed Electrical Engineer and a registered Master Electrician
He has 24 years of relevant work experience in the Construction, Manufacturing, Fabrication, and Consulting industries
He has handled different roles which include working as a Project Engineer, Electrician, Draftsman, Design Engineer, and Technical Engineer 
He was a former Overseas Filipino Worker for more than 10 years 
As an experienced electrical engineer, he has performed the following:
  • Electrical installations in residential, commercial, and industrial establishments
  • Preparation of plans for Electrical works (general wirings, cable trays, electrical equipment enclosures, power layout, lighting layout, motor installation, utility loads, and electrical supply)
  • Creating a fire alarm electrical system, layout, and a riser diagram
  • Creating one schematic diagram
  • Costing and material specifications
  • Bidding, quotations, and tender submissions
  • Managing CAD Operators 
He is proficient in using the following: 
  • AutoCAD
  • Solid Edge
  • Microsoft Office Suite
  • Basic Revit
He can start immediately
He is amenable to working a dayshift schedule for either full-time or part-time roles

Predictive Index Behavioral Profile- Artisan
https://www.predictiveindex.com/reference-profile/artisan/

Strongest Behaviors
  • Detail-oriented and precise; follow-through is deep and literal to ensure tasks were completed in accordance with quality standards.
  • Operationally, as opposed to socially, focused. Thinks, in specific terms, about what needs to be done and how to do it accurately and flawlessly; follows, in a literal way, that execution plan.
  • Focused; can concentrate on the task at hand for long periods. Quickly notices and understands technical matters more than social ones. Consistent and patiently thoughtful.
Behavioral Summary

With experience and/or training, Lui will develop a high level of specialized expertise. Serious and dedicated to the job and the company. His work pace is steady and even-keeled, and he's motivated by a real concern for getting work done thoroughly and correctly. Discipline and circumspect thinking will lend caution to his decision-making; Lui plans ahead, double checks, and follows up carefully on decisions and actions.

A modest and unassuming person, he works autonomously in his area of expertise. When working outside of that area, his drive is to seek specialized knowledge by finding definitive answers from written resources, authoritative management, or established subject-matter experts. Is most effective and productive when he works within or close to his specialty and experience, and prefers to stick to the proven way. If it becomes necessary for to initiate or adopt change, Lui will need to see cold, hard, evidence to prove that the new way is proven, complete, and yields high-quality results. In addition, he’ll carefully plan the implementation to minimize problems and maximize results.


 

Employment History

Project Engineer

Industry:

Architectural Services / Interior Designing

Employment Period:

July 1997 to July 2007 (120 Months)

Duties and Responsibilities:

  •  Involved in the preparation of plans for all Electrical Works
  • Study, review, & analyze project documents such as plans, specifications, general terms/conditions and addendum.
  • Attend Pre-Bid meeting, conduct site inspection and preparation of technical and commercial bid proposals.
  • Coordinate and Arranged deliveries, installation, Inspection of Electrical Works to the Client
  • Carryout Inspection & Quality Control of Installed Electrical Works in Conformance of Specification and Approved Drawing through Coordination and site verification.
  • Issue Site Instruction, Conformance/Non-Conformance Report to the Construction Management.
  • Prepare Documentation, Testing & Commissioning Report, Snagging
  • As-built Drawing for Turn-Over of the Project
Client / Project Handled / Project Involved:
  • NAIA IPT3 International Airport
  • Sheraton Marina Hotel
  • Hyatt Regency Hotel
  • Pioneer Highlands
  • Le Meridien Hotel, World Trade Center
  • Evercrest Nasugbu Hotel
  • Southwoods sports club
  • 6811 Ayala Avenue Hotel, Cairo Lemeridien Hotel
  • Suzhou Sheraton Hotel, Mactan Shangri-la renovation
  • SM Sheraton Hotel
  • Juhu Beach Resort India
  • JW Marriott Hotel India
  • Kenwood Marriot Hotel India.

Project (MEP) Manager

Industry:

Construction / Building / Engineering

Employment Period:

July 2007 to May 2021 (165 Months)

Duties and Responsibilities:

  • Manage the coordination, scheduling and project execution as per Contract.
  • Preparation of tender documents, quotations, drawing plans, and material submittals for client submission.
  • Preparation and timely approval of below sequence of Project requirements.
    • Confirmation of Client, Contractor
    • Engineers Instructions
    • Project daily/Weekly reports
    • Request for Information
    • Material Approval Submittal
    • Shop Drawing Submittals
    • Site Inspection Request
    • Material inspection Request
    • Technical submittals
    • Method of Statement
    • Design Calculation and Details
    • Operation and Maintenance Manual Submittals
    • Non-conformance notification report
    • Subcontractor – Supplier Approval request
    • Equipment, Material Test report Submittals
    • Accident – Incident Notification Reports
  • Prepare reports, and correspondences for proper project assessment.
  • Key person in the signing and approval of Final quotation, Tender Submissions, and Procurement of approved
    equipment and materials.
  • Attend meetings as the company representative.
  • Turnkey project management.
Doha, Qatar/Past Project Handled:
  • Qatar Airway’s Catering Co. Sheraton Hotel, Hilton Hotel, Al-Sharq Hotel & SPA, Ritz Carlton, Holiday Villa and SPA,
  • Al Khayat Contracting Co. (Emir’sPalace)
  • Drake and Skull (Al Rayyan Palace)
  • Albandary Eng’g. (P88, P95, P112A & B, P113 B & C, P105, P119, P145, P147, Naval Base, Naval Academy)
  • ArabTec Const. (P16 Mshereib Hotel Doha Downtown)
  • Harinsa Contracting Co. (Waldorf Astoria Hotel, JW Marriott Hotel)

Project Engineer

Industry:

Electrical & Electronics

Employment Period:

January 2022 to September 2023 (19 Months)

Duties and Responsibilities:

  • In-Charge in the Interpretation of Approved electrical plans for construction in line with the Project BOQ contract for the preparation of actual material take off as needed at the Project Site,
  • In-Charge of the proper designation of Staff for everyday work at the site in line with the Approved Project Schedule.
  • Coordinate with the Office Store for the timely deliveries of materials, equipment, and electrical Instruments.
  • Attend Weekly meeting for Project site status and development.
  • Prepare Daily movement Plan and Report for assigned Project to the Management.
  • Tender and Projects involved:
    • MV Substation & Transmission Line for Seysun Lagoon 5Mw Solar Farm - Seychelles
    • PAIX Data Center – Nairobi, Kenya
    • Sun Mills Paper Factory – Nairobi, Kenya
    • Mgallery Hotel by Sofitel – Nairobi, Kenya
    • Ojijo Mixed-used Hotel Development – Nairobi, Kenya

Sr. Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

January 2024 to September 2025 (20 Months)

Duties and Responsibilities:

  • Manage in the execution of electrical work within allotted time, productivity, quality, safety standards, and in accordance with approved specifications and drawings, scope of work are as follow: Supply, installation, Testing and Commissioning of below Items: 
    • Incoming 13.8KV, grid supplied power system.
    • 1000KVA Generator and system auxiliaries.
    • 3 x 1MVA Power Transformer, HV and LVSG system,
    • 120KVA/0,4Kv/3Ph,
    • Inverter Earthing system
    • Grounding system
    • Lightning system
    • Cable ladder and trunking
    • Power panels and emergency systems.
    • Power Cable, wiring and Termination 
    • FDAS, FCCAP, BMS, MCC
    • Data, Telephone, CCTV, Access Control, Security System, Public Address, Parking Control, Structured Cabling System, MDF, and FCC
    • CATV, and Distributed Antenna System
    • Smoke controller system
    • Fire protection systems, sprinklers, FS and TS
    • Stairway pressurization and DPT.
    • Refrigeration, VFT Air-conditioning systems, and Ducting.

MEP Section Head

Industry:

Construction / Building / Engineering

Employment Period:

September 2024 to March 2025 (6 Months)

Duties and Responsibilities:

  • Manage, Plan, implement, and monitor MEPFS works of the project in coordination with Main construction schedule, Project Managers, Construction managers, Specialty Contractors/Suppliers, Local Government Unit, and Service providers
  • Conduct regular meetings to update progress, resolve issues and concerns
  • Evaluate installation for productivity and safety.
  • Technical Supervision
  • Review and evaluate the MEP plans and specifications and relate the services to the structural, architectural, and interior design plans.
  • Evaluate and resolve discrepancies between MEP, Structural, architectural and ID plans with Project manager and TSG Manager then coordinate with the owners representative for consultants approval.
  • Evaluate and monitor the progress of works of MEPFS contractors and suppliers and relates them to the general construction schedule. CAD Drawings, Resolve issues that may cause potential delay.
  • Evaluates methodology of installation for safety and productivity.
  • Attend and conducts construction coordination meetings and technical meetings.
  • Review and issues MEPFS minutes of the meeting agenda. Quality Management
  • Ensures timely submission of material, equipment and shop drawings approval.
  • Performs QA and QC on all MEPFS works and materials of contractors through regular observation and inspection.
  • Recommend issuance of non-conformance notice to QA/QA Dept.
  • Witness and evaluate major equipment testing of owner supplied materials and contractors supplied materials.
  • Witness and evaluate start-up, testing and commissioning of major equipment. Schedule, Cost and Contracts
  • Monitors the MEPFS contractors schedule and critical milestone dates to ensure the timely completion of the projects.
  • Advises the Project Managers, Project Management Team, and contractors of any constraints that may be a cause of delay in the completion of the project and recommends appropriate solutions to the problems.
  • Evaluate cost proposals and billing of specialty contractor and supplier.
  • Recommend value-engineering or cost-saving measures to the Project managers.

Education History

Field of Study:

Major:

ELECTRICIAN

Graduation Date:

April 2, 1997

Located In:

Philippines

License and Certification: :

N/A

Field of Study:

Engineering (Electrical/Electronic)

Major:

ELECTRICAL ENGINEER

Graduation Date:

January 2, 1996

Located In:

Philippines

License and Certification: :

N/A

Field of Study:

Major:

ELECTRICAL ENGINEER

Graduation Date:

January 2, 1996

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

    AutoCAD, Design Development, Electrical system design, Electronics, Planning,

INTERMEDIATE ★★

    Management

Work at Home Capabilities:

  • Internet Bandwidth: Between 5mbps to 100mbps
  • Working Environment: Private Room
  • Speed Test Result:
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: Lenovo (Intel i7)
  • Processor: Intel i7
  • Operating System: Windows 10

All-inclusive Rate: USD $11.95/hr

Ramil

Candidate ID: 428904


ADVANCED

    Electrical system design, Project Management...

INTERMEDIATE

    CAD...
*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:
Full Time
Preferred Timezone:
Australian Western Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Full Time: $USD 11.95 per hour or $USD 2071.12 per month

Remote Staff Recruiter Comments

  • He worked as a Senior Electrical Engineer.
  • He was the over all in charge of all the electrical works of the project.
  • He prepares materials/equipment take-off and purchase request.
  • He prepares design, shop drawings and as-built plans.
  • He prepares quotations, reports and estimates for each project and coordinates with the client.
  • He can start immediately

Employment History

Project – Engineer

Industry:

Telecommunication

Employment Period:

January 2009 to July 2021 (150 Months)

Duties and Responsibilities:

  • Prepare power requirements for cell sites
  • Evaluate power capacity of sites
  • Evaluate subcon quotations 

Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

July 2009 to August 2010 (13 Months)

Duties and Responsibilities:

  •  Supervise electrical works
  • Prepare estimates and requisitions
  • Review plans and specifications
  • Evaluate subcon billings

Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

November 2010 to June 2013 (31 Months)

Duties and Responsibilities:

  • In-charge in the electrical works
  • Prepares design, shop drawings and as-built plans
  • Prepares materials/equipment take-off and purchase request
  • Assist in the preparation of work permit req’ts
  • Prepares daily, weekly and monthly work schedule and accomplishment report
  • Prepares quotations, reports and estimates
  • Ensure conformance to QESH requirements
  • Coordinate with other trade regarding execution of work plan
  • Supervise the work of subcontractor and check implementation of plans
  • Conducts regular toolbox meeting
  • Monitors testing and commissioning
  • Attends client, staff and subcon coordination meeting

Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

June 2013 to June 2014 (12 Months)

Duties and Responsibilities:

  • Supervision of electrical works
  • Prepare shop drawings
  • Evaluate subcon progress billing
  • Prepare estimates and material requisition
  • Attend coordination meeting
  • Submit progress report
  • Inspect delivered electrical materials

Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

February 2015 to August 2015 (6 Months)

Duties and Responsibilities:

  •  In-charge in the electrical works
  • Prepares design, shop drawings and as-built plans
  • Prepares materials/equipment take-off and purchase request
  • Assist in the preparation of work permit req’ts
  • Prepares daily, weekly and monthly work schedule and accomplishment report
  • Prepares quotations, reports and estimates
  • Ensure conformance to QESH requirements
  • Coordinate with other trade regarding execution of work plan
  • Supervise the work of subcontractor and check implementation of plans
  • Conducts regular toolbox meeting
  • Monitors testing and commissioning
  • Attends client, staff and subcon coordination meeting

Project Manager –Electrical

Industry:

Construction / Building / Engineering

Employment Period:

August 2015 to August 2016 (11 Months)

Duties and Responsibilities:

  • Oversee and direct construction projects from conception to completion
  • Review the project in-depth to schedule deliverables
  • Ensure compliance with building and safety regulations
  • Review the work progress and materials flow
  • Submit billing and project status report
  • Designate and assign tasks to subordinate

Senior Electrical Design Engineer

Industry:

Construction / Building / Engineering

Employment Period:

October 2016 to October 2017 (11 Months)

Duties and Responsibilities:

  • Overall incharge of electrical design and construction
  • Review electrical design
  • Prepare budgetary cost for project inquiries
  • Evaluate cost proposal of subcontractors
  • Review the project in-depth
  • Designate and assign tasks to subordinates
  • Conduct site inspections and attend meetings

Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

October 2017 to October 2020 (36 Months)

Duties and Responsibilities:

  • Overall in-charge of construction works

Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

October 2020 to July 2021 (9 Months)

Duties and Responsibilities:

  • Check electrical design
  • Monitor subcontractor
  • Propose revisions
  • Prepare cost

Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Electrical Engineering

Graduation Date:

October 20, 2007

Located In:

Philippines

License and Certification: :

Registered Electrical Engineer

 


Skills

ADVANCED ★★★

    Electrical system design, Project Management,

INTERMEDIATE ★★

    CAD

Work at Home Capabilities:

  • Internet Bandwidth: Between 5mbps to 100mbps
  • Working Environment: Private Room
  • Speed Test Result:
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: Lenovo (Intel Core i7)
  • Processor: Intel Core i7
  • Operating System: Windows 10

All-inclusive Rate: USD $8.87/hr

Marvin

Candidate ID: 422815


ADVANCED

    AutoCAD, 2D Design, 2D Modeling, ETABS...

INTERMEDIATE

    Design Development, Layout Design, 3D Modeling...
*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:
Full Time Part Time
Preferred Timezone:
Australian Central Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 7.54 per hour or $USD 653.40 per month

Full Time: $USD 8.87 per hour or $USD 1537.88 per month

Remote Staff Recruiter Comments

  • Working as a Site Design Engineer
  • In Previous job he handled Motor Control Centers in a Waste Water Treatment plant
  • Assigned as a Design Engineer in Sri Lanka 
  • Has experience in layout short Circuit Calculation, Short Circuit Calculation Analysis, Lux Calculation,  Genset Required kVA rating, Transformer kVa rating, Capacitor Bank required rating and Voltage Drop Calculation.
  •  His Electrical Design Specification are Lighting & Power Layout, Auxillary Layou (FDAs, CCTV, Voice & Data, Etc.,),Cable Tray Layout, Power Receiving & Distribution Layout ,Lighting & Power Schedule of Loads, Lighting & Power Single Line Diagram Electrical Panel Design, Panel Layout and Schedule of Load
  • Had an experience doing electrical design in Residential and Commercial Buildings Specifically in condominium.
  • Done Electrical system design using Low voltages and high voltages
  • Has good communication skills can express himself well

Employment History

Sr. Design E&I Engineer

Industry:

Construction / Building / Engineering

Employment Period:

October 2021 to June 2023 (20 Months)

Duties and Responsibilities:

  • Electrical Design Analysis and Calculations
  • Provide Technical evaluations on Waste Water Technology Solutions
  • Provide Supervisions for Various Solar Powered Irrigation Projects
Projects Handled
  • BNR Upgrade of Various Waste Water and STP Plant (11 Sites)
  • Design and Build of Alviera Estate STP Cluster 2 - 9.07MLD

ELECTRICAL AND CONTROLS ENGINEER

Industry:

Construction / Building / Engineering

Employment Period:

June 2023 to January 1970 (641 Months)

Duties and Responsibilities:

  • Review shipyards inquiry and/or purchase order specifications
  • Prepare contract offer together with other disciplines.
  • Review HVAC Electric Equipment
  • Manufacturing drawings
  • Review and draw electrical controls and specifications
  • Assists sales promotions and other engineering design works
Projects Handled
  • Chevron Jansz-Io Compression LNG Project
  • ABB/MODEC BM-CC-33 Ehouse

Site Electrical Engineer

Industry:

Construction / Building / Engineering

Employment Period:

January 2021 to July 2021 (5 Months)

Duties and Responsibilities:

  • Office Works
  • Request for Quotation
  • Purchase Request/Order
  • Follow up Delivery from Supplier’s
  • TDD (Technical Due Diligence) Works
  • Review and align Electrical Design Drawings to ensure compliance with design specifications and guidelines
  • Coordinate plans and specifications with other discipline engineers, identifying and clarifying discrepancies.
  • Provide onsite support on electrical installations.
  • Troubleshoot/find solutions when technical and project conflict arises.
  • Work with Electrical Manager(s) to perform cost budget & forecast.
  • Manage Electrical Sub-contractors.

Design Electrical Engineer/ Site Supervisor

Industry:

Construction / Building / Engineering

Employment Period:

June 2015 to April 2020 (58 Months)

Duties and Responsibilities:

  • Product Brochures and Data Sheets Evaluation
  • Design Electrical Calculations i.e(Load calculations, wire sizing, breaker sizing,short circuit calculations,lux level calculations)
  • Design Layouts and Drawings using CAD ( MCC Panel Layouts, Local Panels, Power and Lighting Layouts, Grounding Layouts, Single Line Diagrams)
  • Site Supervision and Installations
  • Commissioning In Charge
  • Shop Drawings, As-Built Drawings
  • Client Inspections and Approval Facilitator
  • Costs Control
  • Material controller

Electrical Engineer

Industry:

Utilities / Power

Employment Period:

June 2015 to December 2018 (42 Months)

Duties and Responsibilities:

  • Short Circuit Calculation Analysis
  • Lux Calculation
  • Genset Required kVA rating
  • Transformer kVa rating
  • Capacitor Bank required rating
  • Voltage Drop Calculation
  • Electrical Design Specification
  • Lighting & Power Layout
  • Auxillary Layou (FDAs, CCTV, Voice & Data, Etc.,)
  • Cable Tray Layout
  • Power Receiving & Distribution Layout
  • Lighting & Power Schedule of Loads
  • Lighting & Power Single Line Diagram
  • Panel Layout
  • Schedule of Loads
  • Single Line Diagram
  • Control Wiring Diagram
  • Components List
  • Request for Quotation
  • Purchase Request/Order
  • Data Sheets & Brouchures
  • Follow up Delivery from Supplier’s
  • Review and align Electrical Design Drawings to ensure compliance with design specifications and guidelines
  • Coordinate plans and specifications with other discipline engineers, identifying and clarifying discrepancies.
  • Provide onsite support on electrical installations.
  • Troubleshoot/find solutions when technical and project conflict arises.
  • Work with Electrical Manager(s) to perform cost budget & forecast.
  • Manage Electrical Sub-contractors.

Property Engineer

Industry:

Property / Real Estate

Employment Period:

May 2014 to May 2015 (12 Months)

Duties and Responsibilities:

  • Responsible for the overall technical aspects of the assigned property, including Construction Monitoring,
  • Preventive Maintenance Programs,
  • Daily Operations and Property Enhancement.
  • In the absence of Property Manager/Administrator, responsibility will be extended to four major functions i.e
  • Operations, Finance, Property Enhancement and Community Development.

Cadet Electrical Engineer

Industry:

Manufacturing / Production

Employment Period:

October 2013 to April 2014 (6 Months)

Duties and Responsibilities:

  • Responsible for the monitoring, operation, repair and maintenance of overhead cranes, motors, auxillary switches, cooling towers, sensors, cooling bed, kick off and all electrically operated machines and equipments to ensure good condition and continous production of rebars and promote safety throughout the whole plant.
  • Coordinate to Plant Supervisor regarding the schedule of machine for Preventive Maintenance, ensure parts and materials needed for auxiliary devices are readily available.
  • Electrical installation works and preventive maintenance of substation (tightening of bolts and connectors, Thermal scanning transformer, bus bars). Additional Task is given by Supervisor from time to time.

Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Electrical Engineering

Graduation Date:

May 10, 2013

Located In:

Philippines

License and Certification: :

PRC Board Passser License #:REE 52596


Skills

ADVANCED ★★★

    AutoCAD, 2D Design, 2D Modeling, ETABS,

INTERMEDIATE ★★

    Design DevelopmentLayout Design3D Modeling

Work at Home Capabilities:

  • Internet Bandwidth: Between 5mbps to 100mbps
  • Working Environment: Private Room
  • Speed Test Result:
  • Internet Type: Broadband
  • Hardware Type: Desktop
  • Brand Name: Customized (AMD)
  • Processor: AMD
  • Operating System: Windows 10

All-inclusive Rate: USD $7.85/hr

Johnquil

Candidate ID: 342793


ADVANCED

    AutoCAD, Technical Documentation, Project Management, People Management...

INTERMEDIATE

    Instrument Calibration, Microsoft Visio...
*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:
Full Time Part Time
Preferred Timezone:
Australian Western Standard Time Australian Central Standard Time Australian Eastern Standard Time New Zealand Daylight Time Hawaii Standard Time Alaska Standard Time US Pacific Standard Time US Mountain Standard Time US Central Standard Time US Eastern Standard Time UK London
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Part Time: $USD 9.90 per hour or $USD 857.81 per month

Full Time: $USD 7.85 per hour or $USD 1360.13 per month

Remote Staff Recruiter Comments

  • John has 14 years of experience comprised of different role in the industrial sector but aligned with Industrial Automation and Process Instrumentation. 9 years of that experience came from manufacturing companies having different positions in engineering department doing maintenance, repairs, and project implementation and  process improvement. Then the rest of his experience came 
    from designing companies and system integration companies that deals with different projects around the world.
  • Proficient in the following:
    • Troubleshooting and Repair 
    • Project Management and People Management
    • PLC/HMI Programming (handled Allen Bradley, Siemens and Omron products)
    • CAD (Panel and Wiring Diagram)
    • Process and Procedure Development 
    • Calibration 
    • Software Development Design
  • Has worked for an Australian electrical and electronics company where he designed automation control systems.
  • Available to start immediately.

Predictive Index Behavioral Profile - Individualist

Strongest Behaviors
  • Persistence; consistent pursuit of goals in calm, methodical manner even when setbacks occur. Opinionated; slow to change.
  • Casual with rules. Focused on the goal, not how to get there; willing to bend the rules. Delegates implementation details.
  • Unworried and unhurried; takes each day as it comes with little planning for what might happen, particularly given the predictable routines that have been established.
Behavioral Summary

Johnquil is independent and individualistic in thinking and behavior. Has strong ideas and opinions and expresses them with confidence and certainty.

Having a willingness to take risk, this individual is likely to develop and act on ideas that are distinctly new or unconventional. This is a creative and nonconformist personality.

In expressing and acting on their ideas, this individual is determined and persistent and has the kind of confidence and nerve involved in initiating innovation or change. Very determined and persistent, once a goal is set they’ll generally push hard to reach it, regardless of the goal’s popularity with others. Undaunted by criticisms or failures.


Employment History

MEE SUSTAINING TECHNICIAN

Industry:

Semiconductor / Wafer Fabrication

Employment Period:

August 2005 to January 2006 (4 Months)

Duties and Responsibilities:

  • Maintain, troubleshoot and repair all equipment in End of Line production area including Auto Frame Loader robot sequence programming.
  • Also Responsible for the ESD grounding of working tables, machines, and other equipment being used in production.
  • Responsible for wiring installation of machines during relocation.

MEE SUSTAINING TECHNICIAN

Industry:

Semiconductor / Wafer Fabrication

Employment Period:

January 2006 to July 2007 (18 Months)

Duties and Responsibilities:

  • Responsible for all issues encountered on Singulation Station.
  • Create a program used for new product on Singulation Station.
  • Responsible for buy-off of machine and new product on Singulation Station. Also Responsible for new product innovation in the department.
  • Build and implement Skill Test and training module for technicians that will be assigned to Singulation Station.

MAINTENANCE COORDINATOR

Industry:

Manufacturing / Production

Employment Period:

December 2007 to August 2008 (8 Months)

Duties and Responsibilities:

  • Manage technicians and engineers on repair and troubleshooting.
  • Responsible for manpower schedule for Maintenance and Work Order.
  • Implement Project Study new machines, projects, or renovations.
  • Prepare and manage documents for Engineering Department and enhance old guidelines and procedures existing in the department.

DESIGN ENGINEER

Industry:

Employment Period:

December 2008 to January 2009 (1 Months)

Duties and Responsibilities:

  • Design Panel Diagram using Autocad Software
  • Design Wiring Diagram “Point to Point” and “Detailed”.
  • Modification of P&ID
  • Prepare all Instrumentation & Control documents and drawings needed by senior engineers.
PROJECTS: 
  • Nansemond Waste Water Control System - New York, USA 
    • Design Control System wiring diagram and Instrument hook-up  diagram. 
  • Croton H Control System - New York, USA 
    • Design Control System wiring diagram and Instrument hook-up diagram.

AUTOMATION ENGINEER

Industry:

Employment Period:

February 2009 to June 2009 (4 Months)

Duties and Responsibilities:

  • Develop and Edit PLC and SCADA/HMI programs.
  • Commission and Implement project including preparation of all documents for every project.
  • Provide any kind of Technical Support on different Industries.
PROJECTS: 
  • Diverter and Packaging Upgrade Project for Cracker Line 
    • Install additional conveyor and modify pathway by using diverter system for Cracker Line Rejection System. 
    • Modify packaging parameters to attain good finish product. 
  • Wyeth Dryer Monitoring System
    • Install and Modify Product Monitoring for their barcode system. 
  • PLC Maintenance 
    • Perform Preventive Maintenance activity to their control system and do backup of their current PLC program. 
    • Modify program base on the end-user preference parameters.

ELECTRICAL & INSTRUMENTATION ENGINEER

Industry:

Heavy Industrial / Machinery / Equipment

Employment Period:

June 2010 to June 2013 (35 Months)

Duties and Responsibilities:

  • Act as Instrumentation Design Engineer for some of the projects and Lead Control System Engineer at the same time.
  • Manage project deliverables and designate it to respective engineers for their work with accordance to Project timeline. Identify and dictate right control system for each project.
  • Design and prepare all Instrumentation Control Systems deliverables such as P&ID, HAZOP Plan, Instrument Hook-up Diagram, Control System Block Diagram,  functional Description, Schematic Diagram, Sequence Logic Diagrams, System Control & Interlocks Schedule, Pneumatics & Hydraulic Control Schematic, System Architecture and other Instrumentation & Control Systems Deliverables.
  • Provide troubleshooting assistance to site operation and proper solution.
  • In-charge with the development of Automation System for every equipment and solutions
PROJECTS:
  • Blayney Filter Machine Integration - New Crest Mining - Orange County, NSW, Australia 
    • Integrate manufactured Filtration Machine to their existing control system. 
  • Filter Machine Integration - Maeden Alumina Mining – Saudi Arabia 
    • Install and Integrate 3 manufactured Filtration Machine to their  existing control system. 
  • GE Turbine Skid Module, Controls and Instrumentation  - Clients from Belgium, China, Australia, Malaysia, New Zealand and Middle East Countries. 
    • Install instruments and control system base on clients different Functional Description of the Skid.

INSTRUMENTATION AND CONTROL SUPERVISOR

Industry:

Manufacturing / Production

Employment Period:

June 2013 to February 2019 (67 Months)

Duties and Responsibilities:

  • Lead the Instrumentation & Control Group in maintenance of all equipment in the plant.
  • Lead the group in troubleshooting, repair and monitoring of all equipment specially those automated related equipment like Motor Controls, Servo motors and drives, VFD, Instruments, PLC, HMI / SCADA, Measuring, Metering and Controlling Devices, Pneumatics / Electro-Pneumatic devices and other similar devices in the process and utilities equipment.
  • Responsible on all Instrumentation and Automation projects in the plant.
  • Responsible on spare parts management and safety process of the plant. P
  • Participate on every HAZOP and HACCP as representative and Team Leader of Instrumentation and Control Team.
  • Participate on the review of the P&ID used in the plant for the Process Control and Instrumentation side.
  • Responsible for Training and development of technicians in the plant.
  • Perform as Factory Leader and help the whole company achieving its Yearly Performance by supporting all WCM targets and KPIs .
PROJECTS: 
  • Plant Capacity Expansion Project 
    • Relocate equipment and install additional production lines for the capacity expansion. 
    • Prepare drawing layout of all the equipment and conveyors that will be moved and install based on actual dimensions. 
    • Evaluate designs of the conveyors system. 
    • Evaluate every Control System that will be used in the project based on PFD, P&ID and Functional Description that been prepared before implementation. 
    • Installations includes 2 New RUF Machine, Big Drum Cone Line with Kuka Robot for Packaging, 2 Hardening Tunnel, 10 Ageing Tanks, 1 New Conveyor system for 4 Production Lines and Instrumentation & Controls from Mix Plant to Packaging Area. 
    • Relocation of Flexline Tub Filling Line, Versaline Stick Filling Line, and RUF Tubline Machine including their corresponding conveyor system. 
    • Installation of X-ray Machines, Carton Formers and Check weigher for each conveyor system corresponding to each filling lines need.
  • Process Integration for Rocket Jelly Product 
    • Integrate additional Accessory Equipment such as Conveyors, Choco tanks, Steam line, and Conversion kits (End Seal, Fin Seal and Wrapper Folding Box for packaging and Ice Cream Molds). 
    • Assess accessory equipment`s floor layout and install it w/out affecting existing process of the production line. 
  • Ice Cream Mix Match Project 
    • Automating the monitoring of the mixes and controlling the pump to reduce Ice Cream Mix waste. 
  • Ammonia Plant SCADA and Instrumentation 
    • Installation of New Instruments to the plant. Replacing old/malfunctioned instrument base on functions needed for the automation. 
    • Integration of all equipment in the Ammonia Plant for Monitoring and Minor Controls. 
  • Cone and Tub Line Controls Upgrade 
    • Upgrading of Control System and Mechanical Stations of the Ice Cream Filling Line for Cone and Tubs. 
    • Replace and Install New Conveyor System for the Filling lines to the Hardening Tunnel base on the layout that we prepare. 
  • Cone Vision System
    • Install Vision System and Integrate it to the Machine`s reject system for cone packaging quality. 
  • Mix Plant Control System Upgrade 
    • Upgrade existing Hardware setup for PLC-CPU to Redundancy setup. 
    • Upgrade existing SCADA system and includes additional  instruments and other equipment added to the Mix Plant process.

HEAD OF AUTOMATION

Industry:

Employment Period:

February 2019 to August 2020 (18 Months)

Duties and Responsibilities:

  • Spearhead Automation Projects and act as Project Manager.
  • Provide technical support for the clients in SEAA Region.
  • Manage all activities of Automation Department and make sure all activities are distributed accordingly.
  • Act also as the Business Development for the Philippines. To acquire projects in the Philippines and to create opportunities in terms of Automation.
  • Develop partnerships with Automation OEMs and support them on their internal projects.
  • We do projects in Different Industries from Manufacturing and Grains Processing. We cater Process and Equipment optimization from Material Handling up to Product Packaging.
  • We provide different types of Automation and MES solutions to different Industries according to their need and resources.
PROJECTS: 
  • SCADA and Controls Integration - PT Golden Gran Mills, Indonesia 
    • Replace existing Centralized Control System and SCADA of the plant with a new System based on Functional Description. 
    • Install new Control Panels that includes new PLC and VFD for the controls of the conveyors and sifter. 
  • Plant Integration System - Golden Bay Grand Terminal, Batangas, Philippines 
    • Integrate new conveyor system that integrating 2 Plant with modification on its safety protocol. 
    • Modify SCADA system base on the additional conveyors added to the plant w/out affecting the interlocks of the process. 
  • MCC Installation and VFD Integration - Citigroup, Bangladesh 
    • Replace existing MCC with new VFD installed for the conveyor and sifters. 
    • Modify existing Control System for the variables and parameters need to the new installed VFDs. 
  • Waste Water SCADA System - Intermalt, Vietnam 
    • install new Control System for their waste water base on the Functional Description of the end user. 
    • Modify P&ID base on the changes that clients need.

Project Consultant

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

September 2022 to July 2025 (34 Months)

Duties and Responsibilities:

Implement OT Cybersecurity program to the assigned company and provide proper documentation for the said program.

Country Manager (Managing Director)

Industry:

Consulting (IT / Science / Engineering & Technical)

Employment Period:

September 2024 to August 2025 (10 Months)

Duties and Responsibilities:

I managed the whole company in the Philippines for Operation and support to other affiliated companies worldwide.

Education History

Field of Study:

Engineering (Others)

Major:

Instrumentation Technology

Graduation Date:

October 19, 2005

Located In:

Philippines

License and Certification: :

Certified Instrumentation and Control Technician


Skills

ADVANCED ★★★

    AutoCAD, Technical Documentation, Project Management, People Management, Engineering, PLC Programming,

INTERMEDIATE ★★

    Instrument CalibrationMicrosoft Visio

Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Private Room
  • Speed Test Result: N/A
  • Internet Type: Fiber
  • Hardware Type: Laptop
  • Brand Name: Macbook Pro (M3 Pro Chip)
  • Processor: M3 Pro Chip
  • Operating System: MacOS X

All-inclusive Rate: USD $8.87/hr

Edward

Candidate ID: 313437


ADVANCED

    ...

INTERMEDIATE

    Computer Hardware, Computer Literacy, Adobe Acrobat, Computer Troubleshooting...
*includes service fee. Please note that hourly rates are linked to the exchange rate, and fluctuate slightly from month to month.

Employment Preferences

Availability:
Full Time
Preferred Timezone:
Australian Eastern Standard Time Australian Central Standard Time Australian Western Standard Time
Hourly & Monthly Rate:
(inclusive of service fee)

*Plus GST for Australian Businesses

Full Time: $USD 8.87 per hour or $USD 1537.88 per month

Remote Staff Recruiter Comments

  • Edward worked for over 20 years, earning a degree in Electrical Engineering. 
  • He had pieces of training on:
    • Autodesk AutoCAD
    • Programmable Logic Control
    • Sensor Technology Dualtech
    • Electro-Pneumatics Automation
    • Basic Pneumatics Automation
  • He prepared a bill of quantities and design drawings for approval of estimated costs for Construction materials, equipment, devices and labor costs.  He attends bid meeting and coordination with clients on projects. He prepares, understands and interprets construction plans, cost estimates, specifications and other contract documents for proper implementation. He prepared quotations from tender documents and generated quotations from price lists. He reviewed the bid documents for electrical and auxiliary layout plans and material specifications. He estimated all the required electrical and auxiliary works. He designed and estimated Electrical and Auxillary systems which included single-line diagrams and layout drawings. He checks for compliance with the requirements of the electrical works, materials, fixtures, equipment and methodologies 
  • He is proficient in using
    • AutoCAD
    • Autodesk 2D
  • He can start ASAP and is open for full time position
Predictive Index Behavioral Profile - Specialist 

Strongest Behavior
  • Driven to protect the company against risk by thoroughly leveraging their background and strictly following “the book.”
  • Cautious; follows a well-established and proven plan to avoid making mistakes. Does the background research necessary to have proof to support decisions before action is taken.
  • Detail-oriented and accommodating; most comfortable working as part of a well-defined team for which they produce high-quality output and decisions.
Behavioral Summary

Edward is a very conscientious person, particularly attentive to, careful of, and accurate with the details involved in the job. Identifies problems, and enjoys solving them, particularly within own area of expertise.

Reserved, serious, and always concerned with the exact correctness of the work. Self-discipline, sense of duty, and respect for authority and tradition are strong qualities in Edward, who takes responsibilities very seriously.

With experience and/or training, Edward will develop a high level of specialized expertise and efficiency. Disciplined and dedicated to the job and the company. Work pace is somewhat faster-than-average, and Edward is motivated by a real concern for getting work done on time and correctly. Discipline and circumspect thinking will lend caution to decision-making; plans ahead, double checks, and follows up carefully on decisions and actions.


 

Employment History

Electrical Estimator (Sales Support)

Industry:

Consulting (Business & Management)

Employment Period:

April 2018 to December 2023 (67 Months)

Duties and Responsibilities:

• Preparing quotations from tender documents.
• Going through tender documents to confirm compliance, product selection.
• Generate quotation from price lists.
• Manage tender schedule and going through tender documents to confirm compliance product selection.
• Preparing quotations received from email for live projects.
• Preparing mechanical specification compliance report.
• Generate VSD price lists per specific customer.
• Preparing Project Delivery Sheet Schedule.
• Generate Tender Sheet Schedule for project monitoring purposes.
• Forwarding purchased orders and quotes to customer service sales for processing.
• Teaching newly hired electrical estimators.

Electrical Estimator (Supervisory Level)

Industry:

Construction / Building / Engineering

Employment Period:

July 2014 to October 2017 (39 Months)

Duties and Responsibilities:

• Review the bid documents which include electrical and auxiliary layout plans and material specifications.
• Estimate all the required electrical and auxiliary works of the project then prepare Bill of Quantities which includes labor and material costs.
• Prepare Request for Quotation to be sent to suppliers to determine the price of estimated materials based on design.
• Follow-up and accumulates different suppliers’ quotations for comparison of prices which will determine the best possible price considering budget cost but not suffering quality.
• Also prepare electrical and auxiliary drawing layout plans if there are any changes or modifications in the most recent updated architectural plans.
• Attend site inspections if there is new project for bidding, or for renovations, modifications, demolitions, dismantling and re-installation, etc., of electrical works.
• Supervise electrical sub-contractor for the implementation of the project.
• Perform related duties and responsibilities as assigned

Electrical Engineer

Industry:

Electrical & Electronics

Employment Period:

June 2008 to August 2013 (62 Months)

Duties and Responsibilities:

• Review the bid documents which include plans and material specifications of the project required in design.
• Design and estimate Electrical and Auxiliary System which includes Single Line or Riser Diagram, Layout Drawing and estimated material take-off.
• Make an Estimate Sheet Summary and Scope of Works.
• Prepare the estimated material take-off in preparation for the Bill of Quantities that were itemized per system.
• Prepare Request for Quotation to be sent to suppliers to determine the price of estimated materials based on design.
• Follow-up and accumulates different suppliers’ quotations for comparison of prices which will determine the best possible price considering budget cost but not suffering quality.
• Prepare an arch file which compose of technical specs, bid documents, drawings, take-off & estimate sheets, request for quotations, and supplier’s quotation – for record keeping and future reference.
• Prepare bill of quantities and design drawings to be presented to engineering managers for approval of estimated costs which may include construction materials, equipment, devices, and labor costs.
• Attend bid meeting with the client for the coordination of the project.

Electrical Engineer

Industry:

Manufacturing / Production

Employment Period:

March 2007 to June 2008 (15 Months)

Duties and Responsibilities:

• Check for compliance the submittal requirements of electrical works’ materials, fixtures, equipment and methodologies prior to delivery of materials. Checks the materials delivered and its workmanship. Reports any deviation or seemed contrary to the plans and specifications as against any accepted engineering standards taking into consideration the interest of the Client in terms of quality, economy and time.
• Prepares, understands and interprets engineering construction plans, cost estimates, specifications and other contract documents for proper implementation.
• Ensure compliance to the requirements through close physical inspection during the execution of the project and installation of equipment and materials by the Contractor. Records and issues corresponding memorandum for non-conforming works to effect appropriate rectification/corrective measures.
• Assist in the preparation of progress reports of electrical works in the project. Prepares necessary correspondence, daily inspection report and punch lists. Maintain records of changes and field notes. Prepare recommendations on approval of progress payments and change orders.
• Perform related duties and responsibilities as assigned

Manufacturing Technician—Equipment

Industry:

Computer / Information Technology (Software)

Employment Period:

June 1997 to October 2006 (112 Months)

Duties and Responsibilities:

• Directly responsible for the repair & troubleshooting of test equipment.
• Conduct equipment audit.
• Make daily report.
• Help implement projects for the improvement of machine utilization with regards to productivity, quality, and human safety

Process Engineer

Industry:

Semiconductor / Wafer Fabrication

Employment Period:

February 1994 to July 1997 (41 Months)

Duties and Responsibilities:

• Perform operations of Engineering Run units before running actual production.
• Study the status of equipment performance in relation to the product that was being process therein.
• Make documents on how the process flow was done in the product.
• Solve problems encountered during operation.

Lightman-Electrician

Industry:

Government / Defence

Employment Period:

January 1992 to July 1992 (6 Months)

Duties and Responsibilities:

• Provide lights and electrical power supply for video camera to be used during live coverage speech of his/her Excellency—The President of the Philippines.

Education History

Field of Study:

Engineering (Electrical/Electronic)

Major:

Electrical Engineering

Graduation Date:

March 29, 1991

Located In:

Philippines

License and Certification: :

N/A


Skills

ADVANCED ★★★

INTERMEDIATE ★★

    Computer Hardware, Computer Literacy, Adobe Acrobat, Computer Troubleshooting, Microsoft Excel, Microsoft Outlook, Microsoft PowerPointMicrosoft WordPlanSwiftAutoCADBluebeam Software

Work at Home Capabilities:

  • Internet Bandwidth: Greater than 100mbps
  • Working Environment: Shared Room
  • Speed Test Result: https://www.speedtest.net/result/15875683078
  • Internet Type: Fiber
  • Hardware Type: Desktop
  • Brand Name: HP (Intel core i5)
  • Processor: Intel core i5
  • Operating System: Windows 11

*Please note that hourly rates are linked to the exchange rate and fluctuate slightly from month to month.